• Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
Cases > absorption tower pipeline anti corrosion resistant coating

absorption tower pipeline anti corrosion resistant coating

‘‘‘‘BD407 high temperature anti chemical impact corrosion resistant epoxy coatings
used in Yunfu power plant desulfurization absorption tower slurry pipeline ceramic
rubber lining abrasion corrosion repairing and protecting


The end of February 2015,when guangdong yunfu power plant overhaul,found that the corrosion resistant lining of the absorption tower
internal is serious damage,in order to maintaining the power plant running smoothly,decided to do local repairing for the damaged parts,
after that,do a layer of anti wear abrasion corrosion resistant coating for overall.

Construction processing:
1.surface treatment:
First clean up the rusting,dirt etc.impurity on the surface of substrates,then do the sand blasting,polishing etc. roughing treatment,
Clean it by cleaning agent and dry it by the airing,make the construction part be clean,dry and no dirty,reach to the ideal bonding effect.

2.The preparation of BD407 anti corrosion resistant repair epoxy coating:
Make BD407 anti corrosion resistant epoxy repair coatings mix uniformly according to the mass ratio A:B=4:1,
smear it on the surface of the pending-repair substrates.

3.The preparation of BD408 high temperature flakes corrosion resistant repair coating:
After the BD407 anti corrosion resistant repair compound epoxy coatings initial curing,make the BD408 flakes high temperature
anti corrosion resistant coating mix uniformly according to the mass ratio A:B=4:1,and be coating on the surface of BD407 adhesive layer,
the adhesive layers should be compacted along one direction,avoid appearing the holes.

4.The preparation of BD705 anti abrasion wear resistant epoxy compound repair coating:
After the BD408 flakes high temperature corrosion resistant epoxy coatings initial curing,scrape coating a layer of BD705 wear & corrosion
resistant coatings on its surface.

5.Curing
It can be put into using after complete curing (curing for 24 hours at room temperature)

Yunfu Power Plant:


Clean up the rubber lining damaged part:


Scrape coating the flakes corrosion resistant coatings:


Brush coating the topcoat:


The damaged part before repairing:


The surface after repairing:


------·ΦΈτΟί----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337