Cases > slurry circulating pump impeller wear resistant coatings

slurry circulating pump impeller wear resistant coatings

  
The application of power plant slurry circulating pump impeller abrasion and corrosion resistant protective coatings:

As the long time scour,corrosion,abrasion etc.problems,the slurry circulating pump impeller,pump case,guard plate of Hubei Huadian power plant need periodic replacement.The impeller and pump body are serious wear,generally we change it for about 7 to 9 months,some of them has shorter replacement period.Not only it will take long time and high costs but also need to tear down the equipment for the traditional maintenance methods,it will affect the normal operation of the power plant.
 
Xiangyang Baidun Protective Coating Material Co.,Ltd gets a set of complete repair technology from years of R&D and construction.Make the two kinds of macromolecule polymeric ceramic material(BD707 small particle wear resistant coatings and BD426 corrosion resistant coating) use cooperatively,it can effectively repair desulfurization system equipment of suffering from cavitation,corrosion and abrasion.This material has excellent wear & corrosion resistance,the comprehensive results are higher than high chrome alloy, rubber lining and ceramic lining plate etc.scheme.
 
Maintenance technology:
 
1.Weld up a skeleton for the larger defect area parts with steel wire mesh first.Clean up the welding slag,blot and other impurity with angle grinder,clean it by cleaning agent and dry it by airing.
 
2.Make BD426 corrosion resistant coatings mix uniformly according to the mass ratio A:B=5:1,and smear on the pending-repair part,smear for two times according to criss cross method,the suitable adhesive layer thickness is about 0.3-0.5mm.Don't smear the second layer until the first layer adhesive initial curing(the adhesive layers don't stick hands).
 
3.After the second layer of BD426 anticorrosion coating initial curing,make BD707 small particle wear resistant coatings mix uniformly according to the mass ratio A:B=4:1(be sure to do it before BD426 adhesive layer hardening),and be coating on the BD426 corrosion resistant coatings,the adhesive layer should be compacted.
 
4.After the BD707 small particle abrasion resistant coating initial curing,can brush a layer of BD426 corrosion resistant coatings on the BD707.
 
5.Complete curing for 24 hours at room temperature,then it can be put into using.
 
1.After the adhesive layer complete curing,heat the adhesive layer up to 60—80℃ and keep this temperature for 2 hours,can improve 30% combination property of the repair coating.
 
2.When the temperature is below 15℃,the curing of adhesive layer is slow,the strength is not easy to rise up completely,can heat it up to the temperature of 60—80℃ and keep this temperature for 2 hours by iodine-tungsten lamp or hair dryer etc. measures after the surface of BD426 corrosion resistant coating initial curing.
  • 共2页:
  • 上一页
  • 1
  • 2
  • 下一页
------分隔线----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337