&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
wear resistant ceramic adhesiv > epoxy bonding agents for ceramic trowelable installations

epoxy bonding agents for ceramic trowelable installations

epoxy bonding agents for ceramic trowelable installations
ceiling installing ceramic tile two parts trowel grade epoxy compound bonding agent

Performance features of BD181 epoxy bonding agent for 
ceiling ceramic tile trowelable installation:
1.  It's the two component adhesive consist of modified heat resistant toughening resin and special curing agent
2. Aging resistant,high temperature resistant,corrosion resistant,good toughness,with high bonding strength.
3. Can cure at room temperature,can also heat for curing
4. With strong initial adhesion,it won't fall off without using magnet or other support measures during construction,optimizing construction
technology and reducing construction cost.
 
Product usage:
With very high bonding force to steel,cement,ceramic,aluminum alloy,stainless steel etc various material,especially suitable for the
bonding of wear resistant ceramic chip under 200¡æ.Suitable for sticking the wear resistant ceramic chip based on medium speed
coal mill cones,coarse powder separator,exhauster,coal dust pipeline etc.suffered ash powder scour equipment and the equipment
of suffering from material strong scour or erosive wear in the industries of steel,cement,chemical etc.Mainly used in the bonding
of wear resistant ceramic chip on the equipment ceiling and facade.
 
Performance index:

product name physical state standard packing Operation time limit
(25¡æ)
Usable time
(25¡æ)
range of application
 BD181  paste 5kg/palstic drum 30 min 6h With very high bonding force to steel,cement,ceramic,aluminum alloy,stainless steel etc various material,especially suitable for the bonding of wear resistant ceramic chip on the equipment ceiling and facade under 200¡æ working condition. 
item color Density
(g/cm3)
Shear strength
(Mpa)
GB7124-2008
Impact strength
(J/cm2)
GB6328-1999
Tensile strength
(Mpa)
GB6329-2008
Compressive strength
(Mpa)
GB1041-2008
Working temperature
£¨¡æ£©
BD181 black 1.29 18 60 91 110 -60-200
 
How to use of BD181 installing ceramic tile trowel grade two parts epoxy compound bonding agent:
  1.Surface treatment:Grinding or sand blasting to clean up the dust,greasy dirt and rust on the surface of adherend,finally clean it by
cleaning agent.

  2.Configure adhesive: According to the specified requirement,make A and B two component mix uniformly. A:B(mass ratio)=4:1

  3.Using adhesive:Make the configured adhesive be coating on the adherend surface uniformly.Double spread will get the better bonding effect.

 4.Curing:Initial curing for 1~1.5 hours at room temperature,full curing for 24 hours,heat it up to the temperature of 80¡æ and keep this
temperature for 2 hours,then do the post curing,it can get the higher strength(≥18MPa)

  5.It’s suitable to configure 300¡«500g adhesive every time,too much adhesive is not easy to mix uniformly,every time the usable time of
configuring adhesive is about 30¡«40min,the usable time is long for the low temperature,the usable time is short for the high temperature.
Can adjust the configuration adhesive quantity according to the actual condition.
 
Packing specification:
Packed in a plastic drum, A component: 4Kg/drum,4 drums/carton, B component: 1Kg/drum,12 drums/carton or 8 drums/carton.
 
Transportation storage:
Sealed storage in the cool and dry place.The warranty period is 1 year.Avoid placing it upside down,knocking against and transporting it
as a non-dangerous product during transportation.
 
Special version:
1.This parameter is for laboratory conditions,due to the actual working condition is more complex,suggest the users to do the pretest
according to actual working condition.

2.When the environment temperature is below 15¡æ,the curing time will prolong,should take proper heating measure

3.When the environment temperature is more than 25¡æ or the mixing quantity is too large,the curing speed will expedite,should properly
shorten the application time of coating after mixing.
 
Construction protective measures:
1.Wear the protective masks,wear the protective glasses and rubber gloves
2.Need washing hands with soap before eating,drinking or smoking.
3.The health hazard after touching: a few people will have skin allergy phenomenon,see a doctor in time and avoid touching with this product again.should wipe it with ethyl acetate when the sizing material paste on the skin by careless,then wash it with clear water.Should wash it with
clear water immediately and see a doctor when splashing into the eyes by careless.
 
Warm Prompt:
Residual adhesive solution cured products are non-toxic harmless organic solid,but maybe it will produce poisonous gas when burning,non-professional personnel can not do combustion disposal,should be sent to garbage power plant or garbage burning place treatment.
 
fire prevention measures:
Should choose dry powder to extinguish fire,can cover and flap it with dry powder,grit(the construction using abrasive) or the non chemical fiber fabric when the sizing material catching fire.

Packaging photo of BD181 ceramic trowelable installations bonding agent epoxy two parts compounds:




------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337