&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
wear resistant coatings > desulfuration tower wear resistant lining ceramic material

desulfuration tower wear resistant lining ceramic material

desulfuration tower wear resistant lining ceramic material
BD7058 desulfurization tower lining ceramic abrasion resistant material,absorption tower liner ceramic coating material
 
Product description:
BD7058 desulfuration tower(absorption tower) lining ceramic material is a kind of special anti corrosion abrasion resistant coating which is
researched and developed for the protecting of desulfurization tower by Xiangyang City Hundred Shield Coating.It is the high performance,
high temperature resistant, abrasion resistant and corrosion resistant polymeric ceramic material which compounded by high performance
wear resistant and corrosion resistant material and modified toughening heat resistant resin and special curing agent.Xiangyang City Hundred
Shield has the core technology,it is the exclusive producing by Xiangyang Hundred Shield.
 
Product features:
1.Wigh good performance of wear resistant and corrosion resistant,do not crack for long-terms hot-water soak,it can sustained and
effective protect desulfurization tower(absorption tower) from erosive wear and lose efficacy,only in this way it can make the equipment
long-term reliable running.
2.With high bonding strength to metal substrates.
3.With good toughness,do not crack,with long working life
4.Suitable for the protection of high temperature erosive wear and corrosion working condition
5.Hot water resistant,steam resistant,acid & alkali resistant(especially for chloridion corrosion resistant)
6.Do not flow and slip,the construction is convenient,the coating after curing has smooth surface.
 
Performance index:

Product name Physical states Operation time limit
(25¡æ)
Curing time
(25¡æ)
Range of application
BD7058 desulfuration tower(absorption tower) lining ceramic material Paste 40 min 24 hours It is exclusively used in the preparation and repairing of desulfurization tower(absorption tower) anti abrasion corrosion resistant coating.
 
Color Density
(g/cm3)
Compressive strength
(Mpa)
GB1041-2008
Tensile strength
(Mpa)
GB6329-2008
Shear strength
(Mpa)
GB7124-2008
Bending strength
(Mpa)
GB1042-1999
Hardness after curing
£¨Shore D£©
ASTM-D-2556
Working temperature
(¡æ)
Gray 1.8 158 50 21 65 125 -50-160
 
How to use:
1.surface treatment:Do coarsening treatment on the pending-repair area, grinding with angle grinder or sand blasting and so on,the surface
after coarsening treatment should be cleaned,the surface after this treatment should be the one coarsening,dry and fresh substrates,should be
no greasy dirt and dust.
 
2.The preparation:Make the A and B two components of BD7058 desulfurization tower(absorption tower) lining ceramic material mix
uniformly according to the weight ratio A:B=4:1,and use it up within 40 min,generally it is while construction and preparation,every time
the largest perparation quantity can’t be more than 4Kg,too much adhesive is solidified too fast,hasn’t been used up until partial adhesive
has solidified and can’t be used. According to the actual temperature,configuration can be appropriately a little more in winter,proper less
in summer.If the temperature is too low,you can properly heat up the A component to reduce viscosity for easy to configure.
 
3.Coating: The suitable coating thickness of BD7058 desulfurization tower lining ceramic material is 4-10mm.Make the well mixed material be 
coating on the pending-repair area layer by layer, the adhesive layers should be compacted, make it infiltrate fully with the substrates.Repair the
surface to be smooth after the coating is coated in the suitable size.This material can’t do machining,so you should pay attention to controlling
the coating thickness to avoid appearing interference phenomenon in the assembly.
 
4.Curing: It can put into using after curing for 24 hours at the temperature of 25 deg C.When the temperature is below 15 deg C,the coating
can’t be complete curing,should heat it up to the temperature of 80 deg C and keep this temperature for 2 hours to promote the coating be fully
curing after the coating initial curing (can use the iodine tungsten lamp to do irradiation heating with 40cm distance from the coating.)
 
Transportation and storage:
Sealed storage in the cool and dry place. The warranty period is 12 months.Avoid placing it upside down, knocking against and transporting 
it as a non-dangerous product during transportation.
 
Packaging specification:
Two components,20Kg/set,packed in a plastic drum, A component: 16Kg/drum, B component: 4Kg/drum.

Product packaging photo of BD7058 desulfurization tower wear resistant repair special ceramic lining coating material:

 
 
 
 
 
 
 
 
  

------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337